Shore Management Solutions specializes in providing highly skilled and experienced construction project management and consulting services. Our expertise extends to self-performing general construction, paints and coatings, selective interior demolition, architectural metal stud installation, vertical high-pressure washing, mortar repairs, and tuckpointing. In addition to our core services, our team members specialize in mechanical contracting, multistory general contracting, and industrial floor coatings.

 Capability Statement

Core Competencies:

Management and Consulting:

• Design/Bid/Build and Design/Build

• MATOC, MACC, RMACC, IDIQ, and Sole Source Contract Vehicles

• USACE CQM Three Phases of Control, OSHA 30, NAVFAC E-CATTS

Team Capabilities 

Licensed Mechanical Services, Plumbing, HVAC, and Refrigeration

State of Florida Certified General Contractor, Marine Construction, and Multistory Vertical Construction

Industrial Floor Coatings Specialist successfully performs large-scale floor coating applications up to 100,000 SF

Company Data:

Shore Management Solutions, LLC, Panama City Beach, FL 32407                                                            

Thaina Mark / Managing Member / Project Manager / CQM / Hazmat / ECATTS

info@shoresolutionsfl.com (850) 919-3777 w. (575) 574-7568 c.

https://shoresolutionsfl.com/

UEI: RD6EPH4TKVT9 / CAGE: 8UES7

Bonding Capacity: 1M Single, 1M Aggregate

236220 Construction management, commercial and institutional building construction

541611 Administrative management and general management consulting services

238220 Plumbing, Heating, Ventilation, and Air Conditioning                                                                   

238330 Flooring Contractor

238320 Paint and Coatings

238990 All Other Specialty Trade Contractors

 Past Performance

SABER Contract Eglin AFB, Subcontractor for Multiple task orders, February 2022-Present. Architectural Finishes, Selective Demolition, Wet Pipe Sprinkler Systems and Testing, Painting, Epoxy Floors, and Roofing.

·       Pressure wash and paint exterior, remodel restroom walls, flooring, cove base, and replace blast glass. B9354, Value 34K FA2823-21-F-0386

·     Lobby repairs, remove wallpaper, texture, paint, carpet tiles, and cove base. B374, Value 14K FA2823-21-F-0485

·     Pressure wash and paint interior CMU, repair and paint gypsum ceiling, seal and stripe concrete floor. B916, Value 30K FA2823-22-F-0171

·     Seal Observation Tower windows (structural sealant), demo roof, and install fluid-applied elastomeric (aliphatic) roofing system. B8730, Value 36K FA2823-22-F- 0191

·     Remove and replace the multilevel epoxy floor with a 3-part system and broadcast chips. B8777, Value 50K FA2823-22-F0187

·     Demo walls, new architectural metal studs, ACT, gypsum, paint, carpet tiles, and cove base. B13rm152, Value 65K FA2823-22-F-0293

·     Demo walls, demo flooring, and base, install new walls, level floor, paint, LVP, cove base. B843, Value 120K FA2823-22-F-0438

·     Demo tiles, and paint walls. B22, Value 15k FA2823-20-F-0487

·     Texture and paint walls, demo cove base, repair and paint 3-story CMU wall stairwells, R&R cabinets, and vanity countertops. B374, Value 82K FA2823-23F0283

·     Demo bathrooms, pressure wash and paint bunker walls, B8740-8717, Value 19K FA2823-23-F-0221

·     Pressure wash and repair vertical mortar on 4-story exterior CMU walls, repair and paint gypsum ceilings. B848, Value 82K FA2823-23-F-0272

·     Pressure wash and paint the exterior and soffit. B251, Value 65K, FA2823-24-F-0122        

2. Renovation of Northeast side and Nosedock B422 Eglin AFB, FL. Value $4.5M Design/Build April 2020‐April 2023. Project Management contract of multiple trades-MEP, Steel Trusses, Roofing, Abatement, Demolition, FA, FP, COMM, Curtainwalls, Openings, and Finishes.

3. B1195 SCIF Facility Eglin AFB, FL. Value $1M Design/Build January 2020‐January 2021—Project Management contract. Bring partial building to ICD 705 SCIF Standards, STC 50 OH, and personnel doors, and install new Monaco system.

4. Renovate Hanger 421 Eglin AFB FL, Value $5M Bid/Build October 2018-December 2019. Project Manager for Prime Contractor. MEP, Steel Trusses, Roofing, Abatement, Demolition, FA, FP, COMM, Curtainwalls, Blast Openings, and Finishes.

5. B1352 Replace 2-300 Ton Chillers PWD Key West FL NAS, Design-Build, Value: $1.9M October 2018-September 2019. Project Manager for Prime Contractor. Replaced 2-split 300-ton chillers that support 5 buildings. Abatement, demolition, and removal. Replaced chilled water pumps, condensate pumps modified ductwork, DDC, insulation, FCU’s, and louvers.

6. Multiple Hangers Freeze Plan, Eglin AFB, FL. Value $750K Bid/Build October 2018‐March 2020. Project Manager for Prime Contractor. Tank temperature and level sensors installation and testing. Install Freeze Protection on 10 hangers.

7. Multi-Year Basewide Paint IDIQ Multiple task orders, Robins AFB GA, Value NTE 840K, August 2016-February 2020. Project Manager for Prime Contractor including painting and epoxy flooring task orders. 

8. Multi-Year Basewide Protective Coating IDIQ Multiple task orders, Hurlburt Field FL, Value NTE 980K, October 2016-March 2020. Project Manager for Prime Contractor including paint and epoxy flooring task orders.

 

Further Noteworthy Projects and References are available upon request